Downloads
Overview Search Downloads Up
Category: Resources

Files:
Suggested Split of AS (IEC) 61508 Safety Lifecycle Phase Responsibilities for Brownfields Projects

(0 votes)

Download
Download

This is an MSWord extract from a paper by Mike Dean, EUC Engineering, given to 5th Safety Control System Conference, IDC Technologies, Perth WA 25-26th March 2014.  The paper is titled “Improving Allocation of Client & Contractor Responsibilities for AS 61508 Safety Lifecycle Activities”.  Download the whole paper in PDF format from www.euceng.com.au/downloads.




Created
Size
Downloads
2015-07-10
130.5 KB
235