Downloads
Overview | Search Downloads | Up |
Category: Resources |
|
|
Files:
Suggested Split of AS (IEC) 61508 Safety Lifecycle Phase Responsibilities for Brownfields Projects |
|
This is an MSWord extract from a paper by Mike Dean, EUC Engineering, given to 5th Safety Control System Conference, IDC Technologies, Perth WA 25-26th March 2014. The paper is titled “Improving Allocation of Client & Contractor Responsibilities for AS 61508 Safety Lifecycle Activities”. Download the whole paper in PDF format from www.euceng.com.au/downloads. |
Created Size Downloads |
2015-07-10 130.5 KB 235 |
||